August 16, 2024

Upcoming Changes to Stationary Source Regulations

EPA’s Spring 2024 regulatory agenda has been released. The following table summarizes EPA’s Office of Air and Radiation’s (OAR) plans for proposing and finalizing new regulations. Among other things, OAR is responsible for crafting regulations under the NSPS, NESHAP (including air toxics), and NSR programs. The table is not all-inclusive of every OAR regulatory action. Instead, it includes those actions McCoy and Associates believes to be of broad interest to the regulated community.

Spring 2024 OAR Regulatory Agenda—NSPS

Rule description

Action

Schedule date

Stationary internal combustion engines: Electronic reporting, Subparts IIII and JJJJ

Final Rule

7/24

Oil and natural gas: Technical corrections, Subparts OOOOA, OOOOb, and OOOOc

Final Rule

7/24

Other solid waste incinerators: Review, Subparts EEEE and FFFF

Supplemental NPRM

9/24

Volatile organic liquid storage vessels: Review, Subpart Kb

Final Rule

9/24

Stationary combustion turbines: Review, Subpart KKKK

NPRM

11/24

Large municipal waste combustors: Review, Subparts Eb and Cb

Final Rule

11/24

Existing fossil fuel-fired combustion turbine EGUs: Emission guidelines for GHG emissions, Subpart UUUUb

NPRM

12/24

Marine tank vessel loading operations: Review, Subpart Y

NPRM

6/25

Residential wood heaters, hydronic heaters, and forced-air furnaces: Amendments, Subparts AAA and QQQQ1

NPRM

TBD

Municipal solid waste landfills: Reconsideration of standards, Subparts Cf and XXX1

NPRM

TBD

Spring 2024 OAR Regulatory Agenda—NESHAP and Air Toxics

Rule description

Action

Schedule date

Hazardous waste combustors: Removal of emissions exemption and new electronic reporting requirements, Subpart EEE

NPRM

7/24

Coke oven batteries: Review, Subparts L and CCCCC

Final Rule

7/24

Lime manufacturing plants: Amendments, Subpart AAAAA

Final Rule

7/24

Reciprocating internal combustion engines: Electronic reporting, Subpart ZZZZ

Final Rule

7/24

Review of major MACT to area (MM2A) final rule

Final Rule

9/24

Dry cleaning facilities: Review, Subpart M

Final Rule

9/24

Chemical manufacturing area source: Review, Subpart VVVVVV

NPRM

11/24

Polyether polyols production: Review, Subpart PPP

NPRM

12/24

Oil and natural gas sector: Reconsideration of review, Subparts HH and HHH

NPRM

12/24

Rubber tire manufacturing: Review, Subpart XXXX

Final Rule

12/24

Oil and natural gas sector: Removal of affirmative defense provisions, Subparts HH and HHH

Final Rule

12/24

Stationary combustion turbines: Reconsideration of the 2020 residual risk and technology review, Subpart YYYY

NPRM

1/25

Regulatory requirements for new HAP additions to Part 63

Final Rule

1/25

Portland cement manufacturing: Review of idle kiln provision, Subpart LLL

NPRM

3/25

Hospital ethylene oxide sterilizers: Review, Subpart WWWWW1

NPRM

9/25

Polyvinyl chloride and copolymers production: Reconsideration of emission limits, Subparts DDDDDD and HHHHHHH1

Final Rule

9/25

Secondary lead smelting, Reconsideration of petition, Subpart X1

NPRM

10/25

Primary magnesium refining: Review, Subpart TTTTT1

Supplemental NPRM

11/25

Hazardous waste combustors: Review, Subpart EEE1

NPRM

12/25

Plywood and composite wood products: Review amendments, Subpart DDDD1

Final Rule

7/26

Requirements for sources that reclassify under MM2A final rule1

Final Rule

TBD

Spring 2024 OAR Regulatory Agenda—NSR and Other Rules

Rule description

Action

Schedule date

Clarification of Title V definition of “applicable requirement”

Final Rule

1/25

Review of secondary NAAQS for NOX, SO2, and PM

Final Rule

1/25

Reconsideration of NAAQS for O31

NPRM

TBD

PSD: Establishment of ozone and PM2.5 significant impact levels1

NPRM

TBD

Review of NAAQS for Pb1

NPRM

TBD

Review of primary NAAQS for NOX1

NPRM

TBD

PSD and NNSR: Reconsideration of fugitive emissions rule1

Final Rule

TBD

PSD and NNSR: Project emissions accounting revisions

Final Rule

TBD

ANPRM = advanced notice of proposed rulemaking; NPRM = notice of proposed rulemaking; TBD = to be determined

1Long-term actions: Items under development but for which the agency does not expect to have a regulatory action within 12 months after publication in the regulatory agenda.

Source: EPA’s Spring 2024 regulatory agenda; EPA’s Spring 2024 long-term actions

 


©2024 McCoy and Associates, Inc. All rights reserved.

McCoy and Associates has provided in-depth information to assist environmental professionals with complex compliance issues since 1982. Our seminars and publications are widely trusted by environmental professionals for their consistent quality, clarity, and comprehensiveness.

 

Disclaimer

Considerable care has been exercised in preparing this document; however, McCoy and Associates, Inc. makes no representation, warranty, or guarantee in connection with the publication of this information. McCoy and Associates, Inc. expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any federal, state, or municipal law or regulation with which this information may conflict. McCoy and Associates, Inc. does not undertake any duty to ensure the continued accuracy of this information.

This document addresses issues of a general nature related to the federal environmental regulations. Persons evaluating specific circumstances dealing with the environmental regulations should review state and local laws and regulations, which may be more stringent than federal requirements. In addition, the assistance of a qualified professional should be enlisted to address any site-specific circumstances.